Fish ladder Winkler


The fish ladder (FAH) at the Winkler power plant on the Olsabach was planned by us.

Likewise, the construction was accompanied together with Ms. Melanie Ullmann in order to implement it in a natural way.

General project data:

Fish region Trout region
FAH-type Near-natural pool pass
Height difference at the weir 2,4 m
Pool length ca. 2,0 m
Pool width between 1,8 and 2,5 m
Height difference of the bars 17 bis 18 cm