Fish ladder diocese Gurk (KW Pöckstein)
The fish ladder (FAH) Pöckstein at the Gurk power plant was planned by us, and the installation was also supervised.
General project data:
| Fish region | transition area trout / grayling region |
| FAH-type | slot pass (made of precast concrete) |
| Flow rate | 250 l/s |