Fish ladder diocese Gurk (KW Pöckstein)

The fish ladder (FAH) Pöckstein at the Gurk power plant was planned by us, and the installation was also supervised.

General project data:

Fish region transition area trout / grayling region
FAH-type slot pass (made of precast concrete)
Flow rate 250 l/s