Fish ladder Neuper-Eberstein

We planned the fish ladder at the Neuper power plant, and we also monitored the construction in 2009.

A residual water screw was also implemented at the project location, which was planned by the Perzplan office.

General project data:

Fishregion Lower trout region (metarhihtral)
FAH-type enatureĀ® Fishpass
Height difference at the weir 3,6 m
Height difference slot area 18 cm
Flow rate ca. 150 l/s